What We Know About Clifton Riverside

What We Know About Clifton Riverside

Details

Address

2400 E Belknap St, Fort Worth, TX 76111

Units

94

Floors

4

Developer

Overland Property Group

About

Clifton Riverside will be built up out of the flood plain elevation as required, while maintaining access and visual presence with the water and trails.  The entry lobby, leasing, and clubhouse amenity spaces have been relocated in the design to sit on the East side of the building, now directly viewing the River.  Past the river is Downtown Ft. Worth.  Now that the Clifton Riverside is situated viewing over the river, the clubhouse-commons-fitness-game rooms were moved to the 4th (top) floor to maximize these epic views.  A large expanse of glass stretches across the whole length of these common spaces, making sure nothing impedes on that view.  The common lounge glass façade was pulled back at an angle to make space for an exterior rooftop deck, above which, hangs a cantilevered sunshade structure to protect from the harsh Texas sun, and minimize glare on the interiors, but remain completely open underneath, so no columns or structural members will block the view.

Not to be overlooked is the central courtyard. Clifton Riverside entry lobby and common spaces on the ground level, afford the residents the ability to open the operable glass wall to the courtyard and let the space flow together, indoor-outdoor.  A variety of seating and lounge areas are scattered about the courtyard, gravitating around fire pits, bbq grills, exterior TV’s, and water features.  Clifton Riverside building itself is comprised of exterior walkways and stairs, allowing the building and the courtyard to have as much natural connection as possible, while being protected from the harsh exterior parking and busy highway environments.

Estimated Budget

$13,500,000 (Texas Department of Licensing and Regulation)

Timeline

This project is currently in the City permitting process, with expectations to start construction Fall of 2022. (Jgarchitects)

Start Date:

7/31/2022

Completion Date:

12/31/2023

Related content

No items found.

See all blog categories